The scope of this project is to simulate packing line that consist of 8 machines along with conveyors. The simulation should include control in process parameter of each machine.
The objective of this project is to conduct What-If-Analysis to predict any possible modification in the line (e.g., change in conveyor length, change in filling speed , change in number of nozzle...)