R language -- 2

Chiuso Pubblicato 2 anni fa Pagato alla consegna
Chiuso Pagato alla consegna

Context:

Your company has operations in very remote area where centrifugal pumps are used to extract valuable liquids. Pump

maintenance is done by a contractor. All of the 100 000 pumps in your installations get maintained once a year, but there is

an option to repair selected pumps after 6 months at a cost. Your role will be to decide which pumps, if any, get the month 6

maintenance. The pumps will all be maintained at the end of the 12 months, whether they had a maintenance done at 6

months or not.

When pumps are maintained, the contractor may change the bearings, the seals, or replace the whole pump. Due to the

remote location, every pump maintenance has a base cost of $ 500, plus the cost of the repair. Note that your contract allows

for up to 20 000 maintained pumps at 6 months at the regular rate. If you exceed that number, the repairs would be

considered an emergency call at a hefty base cost of $ 5 000, plus the repairs. Those repairs, urgent or not, follow a fixed cost

schedule:

• $ 4 000: Whole pump replaced

• $ 200: Bearings replaced

• $ 100: Seals replaced

• $ 250: Bearings and seals replaced (cheaper to replace both at once)

Even if no parts are replaced, the contractor performs an inspection and a tuning of the pump at no additional cost.

Sensors on the pump keep track of energy use, volume of liquid extracted, as well as vibrations of the pump. Because of their

remote location, the data are just stored locally as there are no networks available. The extracted liquid gets collected every

month, and the data are then brought back on a physical device by the transporter.

The company provides you with a summary of the sensor data for the first 5 months of the years to decide which pump will

be maintained at month 6. Last year, a study was also done on 200 pumps that were randomly split in two groups. The first

group got a maintenance at 6 months, then the regular maintenance at 12 months, but the second group just got the regular

maintenance at 12 month. The data from that study are available to you, namely the details of the maintenance and 12

months of sensor data.

Beyond the cost of repairs, pumps consume electrical energy that you pay $ 0.10 per kwh. The liquid that you extract is worth

$ 0.03 per cubic meter. Your objective is to net the largest possible profit during the 12 months period (value of liquid, minus

energy and repair costs). The platform will tell you how much more profit you make compared to doing no maintenance at 6

months.

Sensor Data

A zip file containing the data is available on ZoneCours. The data is split between different files:

• [login to view URL]: The list of repairs that were done on the 200 pumps used for the study last year.

• [login to view URL]: Sensor data for 12 months for the 200 pumps in the study last year.

• [login to view URL]: Sensor data for the first 5 months of the year to help you decide which pump should be

maintained.

You need to prepare a one column CSV file with the list of IDs of the pumps to repair at 6 months

Your objective is based on a business outcome: net profit. The process of prediction will involve cleaning, combining,

analyzing, and modeling data.

Linguaggio Programmazione R Statistica

Rif. progetto: #32208710

Info sul progetto

3 proposte Progetto a distanza Attivo 2 anni fa

3 freelance hanno fatto un'offerta media di $28 per questo lavoro

varimaxanalytic

Hi! I am really interested in this job. I’m data scientist working remotely with various analytical companies. I’m offering best quality and highest performance at a price we are both comfortable with. I can complete Altro

$30 CAD in 2 giorni
(7 valutazioni)
4.2
soumojit86

I am a PhD in Operations Research with 12+ years of building Statistical solutions in R. I read and understood your requirements and I can develop your solution in quick time. Currently, I am working as a Lead AI Scien Altro

$30 CAD in 2 giorni
(0 valutazioni)
0.0
francwanyonyi219

R PROGRAMMING EXPERT , I am best in statistics, R programming analysis of data, SPSS, STATA, MINITAB, R language, Forecasting, Statistical Quality Control, Spatial Data Analysis, Structural Equation Modeling, generatin Altro

$25 CAD in 7 giorni
(0 valutazioni)
0.0