Planning road construction inside factory premises. Close to 2500 sq. mtr of concrete road and approx. 2000 sq. mtr of paver block road. Need a civil engineer for overlooking the work. Around 2 to 3 months of work.
Rif. progetto: 15700549

Info sul progetto

5 proposte
Progetto a distanza
Attivo 6 anni fa

Hai voglia di guadagnare un po'?

I vantaggi delle offerte su Freelancer

Imposta il tuo budget e le scadenze
Fatti pagare per il lavoro svolto
Delinea la tua proposta
La registrazione e le offerte sui lavori sono gratuite
5 freelance hanno fatto un'offerta media di ₹59.944 INR
Avatar dell'utente
Hi, I am Vincent, a civil engineer by profession. I can help you with the assignment. Kindly allow me to discuss the project with you. Regards Relevant Skills and Experience Civil engineer Proposed Milestones ₹83333 INR - NEGOTIABLE
₹83.333 INR in 3 giorni
5,0 (13 valutazioni)
3,9
3,9
Avatar dell'utente
A proposal has not yet been provided
₹41.666 INR in 10 giorni
0,0 (0 valutazioni)
0,0
0,0
Avatar dell'utente
A proposal has not yet been provided
₹62.222 INR in 100 giorni
0,0 (0 valutazioni)
0,0
0,0
Avatar dell'utente
I was working with the Department of Public Works and Highways in our country as project engineer in various projects, roads, drainage, shore protection, school buildings, multi-purpose building, bridges..etc., my short construction methodology are as follows; 1. A survey should be conducted to be precise of the project limits and contours. 2. Layout will be conducted in preparation for the sub-base and base coarse aggregates, any downgrade area should be filled to attain the specifications of the design. 3. After all cuts and fills are accomplished, a sub-grade aggregates will be spread on the area to be cemented, in which a compaction will be conducted to attain a 95% to 100% compaction. 4. After the compaction of the sub-grade is attained, a base coarse aggregates will be spread, depending on the specified thickness, and compaction will be conducted to attain the 95% to 100% compaction. 5, A field density test will be conducted, to assure the base aggregates are fully compacted and are ready for concrete pouring, this will depend on the design of the concrete and thickness. 6. A mock-up will be conducted in the project area, and a concrete cylinder will be made for compression test on specified number of days. 7. If the concrete requires for a reinforcing bars, a design will be submitted with the bar sizes. But with the construction joints, it is required to install reinforcing bars to connect the concrete with maximum adhesiveness.
₹62.500 INR in 20 giorni
0,0 (0 valutazioni)
0,0
0,0

Info sul cliente

Bandiera: INDIA
India
0,0
0
Membro dal nov 22, 2017

Verifica del cliente

Grazie! Ti abbiamo inviato tramite email il link per richiedere il tuo bonus gratuito.
Non è stato possibile inviarti l'email. Riprova per piacere.
di utenti registrati di lavori pubblicati
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Caricamento anteprima
Autorizzazione per la geolocalizzazione concessa.
La tua sessione è scaduta ed è stato effettuato il log out. Accedi nuovamente per piacere.