Filtro

Le mie ultime ricerche
Filtra per:
Budget
a
a
a
Tipo
Competenze
Lingue
    Stato del lavoro
    4 lavori trovati, prezzi in EUR

    Hi there We are looking at building a building from scratch but require a bill of materials inclusive of the following: Estimate of all the bricks required All material including cements, sanitary ware, door and window frames Establish total area to be tiled, to be paved, to be landscaped We just really need all the numbers to be able to scope out the project. Note that there are 2 floors of th...

    €403 (Avg Bid)
    €403 Offerta Media
    25 offerte
    Quantity Surveying Assignment 6 days left
    VERIFICATO

    I need assistance with calculating quantity surveying material, plant and labor costs for cement, rods and vertical footings. Must be dead accurate on finding the item rates and final costs. Your payment is dependent on this. Regards

    €350 (Avg Bid)
    €350 Offerta Media
    11 offerte

    I need assistance with calculating quantity surveying material, plant and labor costs for cement, rods and vertical footings. Must be dead accurate on finding the item rates and final costs. Your payment is dependent on this. Regards

    €213 (Avg Bid)
    €213 Offerta Media
    11 offerte

    I have a restaurant on the pier marina in cairns .we have just been granted permission to put a floating pontoon 18 meters by 10 meters to create an island style feel and serve tapas meals etc

    €23360 (Avg Bid)
    Locale
    €23360 Offerta Media
    5 offerte